General Building - Solutions
SPS|PM Last Planner
SPS|PM Last Planner enables LCI's Last Planner SystemTM through the following key features:

  • Uploading tasks from master, phase & lookahead schedules
  • Facilitating constraint analysis of activities
  • Automating the creation and updating status of production plans
  • Generating PPC & Reasons for Non-Completion reports
Those that are currently using or are planning to implement LCI's Last Planner SystemTM will benefit from SPS|PM Last Planner. SPS|PM Last Planner is supported by SPS|Academy online or onsite training. SPS|Technical Services is available for implementation guidance and integration of SPS|PM Last Planner with your current scheduling methodology and system if deemed appropriate.

SPS|PM for Design Management
SPS|PM for Design Management delivers more effective design and engineering. SPS|PM for Design Management optimizes the use of cross-representational design teams by improving resource utilization, enables better interface management by reducing negative iteration, and supports continuous improvement through the use of standard processes during the design. SPS|PM for Design Management can be integrated with your Building Information Modeling (BIM) system to provide total product and process management.

SPS|PM for Design Management is supported by SPS|Academy online or onsite training. SPS|Technical Services is available for implementation guidance and integration of SPS|PM for Design Management with BIM systems and related collaboration centers.

SPS|PM for Construction Management
SPS|PM for Construction Management provides a total integrated scheduling and production control system for General Building projects. It supports the creation and management of all levels of schedules. It enables constraint analysis of lookahead activities prior to the production commitment process. It provides the ability to efficiently create and status detailed production plans including key performance measurements such as Schedule Variance, Commitment Reliability and Reasons Analysis, based on real time production information. It can also be integrated with BIM systems to provide real-time 4D modeling and simulation capabilities for construction operations and logistics. Cost and progress reporting systems can also be integrated with SPS|PM for Construction Management.

SPS|PM for Construction Management is supported by SPS|Academy online or onsite training. SPS|Technical Services is available for implementation guidance and integration of SPS|PM for Construction Management with BIM systems.

SPS|PM for General & Specialty Contracting
SPS|PM for General & Specialty Contracting delivers enhanced profit and reduced risk for specialty contractors. SPS|PM for General & Specialty Contracting does this through better definition and design of field operations, optimization of people and equipment resources and synchronization of materials supply with site demand. SPS|PM for General & Specialty Contracting can be integrated with numerically controlled fabrication equipment to enable automated synchronization of shop production with site demand.

SPS|PM for General & Specialty Contracting is supported by SPS|Academy online or onsite training. SPS|Technical Services is available for implementation guidance and integration of SPS|PM for General & Specialty Contracting with BIM systems and numerically controlled fabrication equipment.

To learn more, please click here to have an SPS representative contact you.